For more information:
+39 035-450.47.26
info@industrialtechnology.eu
WE PROGRAMM ROBOTS AROUND THE WORLD
OFFLINE PROGRAMMING OF YASKAWA ROBOTS
REDUCE PLANT CONSTRUCTION TIME, MAKE LESS DESIGN MISTAKES, VERIFY CYCLE TIME.
THESE ARE NOT SIMPLE SIMULATIONS BUT RATHER REAL PROGRAMS TO INSTALL IN YASKAWA ROBOTS
OFFLINE PROGRAMMING OF THREE SYNCHRONIZED ROBOTS
Offline plant programming with three robots, simultaneously wire welding, cycle time check, space requirements check and synchronism between robots
OFFLINE PROGRAMMING 4 ROBOTS, 4 GRIPPERS, 3 AXES
Offline plant programming with four spot welding robots, complete with two electric welding grippers on board the robot and two electric welding grippers on the ground, rotary table with base and two trommels of equipment rotation.
PRECISE AND PERFECT MOVEMENTS
In this video you can check the accuracy of the movements of the external axes, which faithfully reflect the data programmed / required by the robot controller
DETAILED SIMULATIONS, EVEN WITH WELD SEAMS
Here in this video you can see the bead generated in real time during the programming phase of a welding path
DETAILED SIMULATIONS, EVEN WITH WELD SEAMS
Here in this video you can see the bead generated in real time during the programming phase of a welding path